All Leeds bus diversions and cancellations as Albion Street and Woodhouse Lane to be resurfaced
Bus numbers 5, 5A, 23, 24, 27, 28(First), 38(First), 39(First), 56 and X84 will all face diversions
Two key bus routes in Leeds city centre are set to be resurfaced this week.
Services travelling along Albion Street and Woodhouse Lane will be affected by resurfacing works on Monday, November 9 and Tuesday, November 10 from 7pm to 5am each night.
Bus numbers 5, 5A, 23, 24, 27, 28(First), 38(First), 39(First), 56 and X84 will all face diversions in both directions as a result of these works.

In Armley, the Stanningley Road junction with Ledgard Way will be affected by roadworks overnight from 8pm on Thursday, November 12 to 5am on Friday, November 13. Service 72 and 508 towards Leeds will divert, while services towards Bradford and Halifax are not affected.
On Sunday (November 15), services travelling along Roundhay Road, Harehills and Fairburn Drive, Garforth will be affected by roadworks. Services 12, 13, 13A, X98, X99, and 163 will all divert.
In Leeds city centre, bus stop 45010914 Merrion C also remains out of use, as a result of ongoing works on Woodhouse Lane, while the Leeds Inner Ring Road will also remain closed due to a bridge inspection works until Friday, November 26 between 7pm and 6am, Monday to Friday only.
Service 7 will divert via Marsh Lane and York Street, missing bus stop 45032209 Victoria L, Vicar Lane, as a result.
Long term closures to A656 Ridge Road Bridge, between Garforth and Micklefield, and Austhorpe Lane Bridge will remain in place until December. Disruption to Dawsons Corner and Stanningley Bypass will also remain in place until early 2027.
Pepper Road Bridge in Hunslet remains closed until end of November. The road will be closed throughout, with a diversion clearly signposted. Bus services 74, 75 and 86 will be diverted in both directions.
In a welcome boost to city services, roadworks on Kingsway, Garforth have been completed with services 174 and 175 returning to their normal routes.