Thousands of motorists use the Leeds Inner Ring Road everyday to get across the city. Yet few will be aware of the untold story of how the project was hindered by delays, controversy and everything in between. It was devised in the 1950s, started in 1964 and yet only completed in the 2000s. These photos, plucked from the YEP archive, aim to bring that story to life. READ MORE: The A to Z of Leeds documentary trailer LOVE LEEDS? LOVE NOSTALGIA? Join Leeds Retro on facebook YEP RETRO NEWSLETTER: Sign up for our free monthly email digest of Leeds nostalgia

7. Leeds inner ring road
The ambitious scheme was not without controversy. In 1959 it was reported that 340 homes would have to be demolished to make way for the road and industrial workshops, cafes, a shop and six pubs also had to bite the dust. | YPN Photo: YPN

8. October 1964
Technical and engineering innovation has been the hallmark of the project as demonstrated by stage one, 3,600ft stretch from Westgate roundabout to Claypit Lane which it was agreed should be built in a cutting and a tunnel. | jpimedia

9. Leeds inner ring road
As the route passed through land owned by Leeds University and Leeds General Infirmary, the 1,200ft-long Westgate Tunnel section was built to such a strength the ground above could be developed. Pictured in August 1973. | YPN Photo: YPN

10. Leeds inner ring road
A coal seam up to 10ft thick in places was discovered during excavations. It was dug out separately and 2,000 tons delivered to the National Coal Board. | YPN Photo: YPN

11. Leeds inner ring road
The first stage was complete in January 1967. An estimated 10,000 people took the opportunity to walk along the route and take photographs before it was officially opened. | YPN Photo: YPN

12. Leeds inner ring road
A view looking south at building work on the Inner Ring Road in November 1968. A bridge is in the foreground with a 'Shand' sign on it. In the distance the BBC can be seen. | Leeds Libraries, www.leodis.net Photo: Leeds Libraries, www.leodis.net


